Industrial boiler houses around Preston do not run on domestic landlord certificates. Plant managers need clarity on industrial boiler gas certificates (CP15 service records, CP16 testing and purging, CP17 safety inspections) and related Gas Safe documentation so audits, insurers and HSE expectations are met.

What plant managers should understand

Prepare before the engineer arrives

Have an asset list, previous certificates, outstanding defects, access permits and operating status ready. Store certificates digitally and link them to your PPM schedule.

Book with clarity

SMR Gas Maintenance Ltd, Gas Safe 562186, supports CP15, CP16 and CP17 industrial gas safety work across Preston and the North West.

What the engineer checks on the day


An industrial boiler inspection is more than a look at the burner. Expect the engineer to check the gas supply and pressures, the burner and its flame supervision, safety shut-off valves, controls and limit devices, the flue and its draught, and plant room ventilation. Combustion is analysed and the readings are recorded so they can be compared with the previous visit. Any defect is classified and explained, with clear advice on whether the plant can keep running. Have someone available who knows the plant and can run it up and down, as the engineer will need to see it firing at different loads.


Common reasons boilers fail inspection


- Safety devices that have not been proved working for some time

- Flue joints or terminations in poor condition

- Ventilation openings blocked or reduced

- Poor combustion readings caused by a burner that has drifted out of set-up

- Missing or out-of-date records from earlier visits


Most of these are cheap to fix if they are picked up early. Left alone, they can mean the boiler has to be shut down until the work is done.


Keeping certification on track


Treat boiler certification as part of your maintenance plan, not a one-off. Put the inspection date in the same calendar as servicing, so defects found at the service are fixed before the certificate is due. Keep each report with the boiler's asset record, and make sure someone on site is responsible for closing out the actions. If you run several boilers, or boilers on more than one site, a planned preventative maintenance contract keeps all the dates and records in one place.


Read more about industrial boiler and steam plant servicing: https://www.smrgas.co.uk/industrial-boiler-steam-plant-servicing-2 and gas safety certificates: https://www.smrgas.co.uk/gas-safety-certificates.


Call 07882 898492 (24/7) or email andy@smrgasservices.co.uk.

Burner gas train with pressure gauges and control panel on a Unitech unit, with an open test kit case on the floorKane 457 flue gas analyser showing a natural gas combustion reading

Call 07882 898492 Ask for a quote

← All articles

Smell gas? Call the National Gas Emergency Service on 0800 111 999 first. Then call us on 07882 898492. Our 24/7, 365-day response.